Projects
Over the years, we’ve learned that success is built on trust, clear communication, proper planning and a dedication to excellence. Learn more about some of our successes below.
![](/media/0gahjuj1/9-new-spillway.jpg?mode=crop&width=358&height=210&quality=65)
Peter Sutherland Sr. Generating Station
Client: Ontario Power Generation & Coral Rapids Power
Location: New Post Creek, Ontario
![](/media/tecoidh5/3-taylor-shaft-tbm-install-overhead-aerial.jpg?mode=crop&width=358&height=210&quality=65)
![](/media/2vngnp2j/2_reach3.jpg?mode=crop&width=358&height=210&quality=65)
Lake Manitoba and Lake St. Martin Outlet Channels
Client: Manitoba Infrastructure
Location: Interlake Region, Manitoba
![](/media/nlso25l4/1_penstock-installation-approaching-tunnel-portal.jpg?mode=crop&width=358&height=210&quality=65)
![](/media/wf3jus5k/2-yec-33529.jpg?mode=crop&width=358&height=210&quality=65)
![](/media/ivzbtljn/2015-11-05_36_culvert-3038-aerial-facing-e.jpg?mode=crop&width=358&height=210&quality=65)
PR 304 to Berens River All Season Road
Client: Manitoba Infrastructure
Location: East Side Roadway, Manitoba
![](/media/v4snkrjg/overview-of-the-site.jpg?mode=crop&width=358&height=210&quality=65)
Davis Diversion Coanda Fish Exclusion Screen
Client: Water Security Agency
Location: Belanger, Saskatchewan
![](/media/0tfl1bdn/9-embankment-dam-construction.jpg?mode=crop&width=358&height=210&quality=65)
![](/media/m2anxub0/1-riverbank-and-at-trail-seine-riverbank-stabilization.jpg?mode=crop&width=358&height=210&quality=65)
Seine Riverbank Stabilization at the Branch 1 Aqueduct
Client: City of Winnipeg
Location: Winnipeg, Manitoba
![](/media/c0fneine/img_5317-1-2.jpg?mode=crop&width=358&height=210&quality=65)
![](/media/qhclhg5g/figure-9.jpg?mode=crop&width=358&height=210&quality=65)