Projects
Over the years, we’ve learned that success is built on trust, clear communication, proper planning and a dedication to excellence. Learn more about some of our successes below.
![](/media/0gahjuj1/9-new-spillway.jpg?mode=crop&width=358&height=210&quality=65)
Peter Sutherland Sr. Generating Station
Client: Ontario Power Generation & Coral Rapids Power
Location: New Post Creek, Ontario
![](/media/tecoidh5/3-taylor-shaft-tbm-install-overhead-aerial.jpg?mode=crop&width=358&height=210&quality=65)
![](/media/teqfhwr5/1-finished-product.jpg?mode=crop&width=358&height=210&quality=65)
New Museum Building for the Royal Aviation Museum of Western Canada
Client: Royal Aviation Museum of Western Canada
Location: Winnipeg, Manitoba
![](/media/2vngnp2j/2_reach3.jpg?mode=crop&width=358&height=210&quality=65)
Lake Manitoba and Lake St. Martin Outlet Channels
Client: Manitoba Infrastructure
Location: Interlake Region, Manitoba
![](/media/wf3jus5k/2-yec-33529.jpg?mode=crop&width=358&height=210&quality=65)
![](/media/gfhdp2vb/1-existing-landfill-with-surficial-waste.jpg?mode=crop&width=358&height=210&quality=65)
Pauingassi First Nation Landfill Expansion
Client: Pauingassi First Nation and Indigenous Services Canada
Location: Pauingassi First Nation, Manitoba
![](/media/0eairtsj/full-scale-test-apparatus.jpg?mode=crop&width=358&height=210&quality=65)
RAS Piping Refurbishment at the North End Water Pollution Control Centre
Client: City of Winnipeg
Location: Winnipeg, Manitoba
![](/media/0tfl1bdn/9-embankment-dam-construction.jpg?mode=crop&width=358&height=210&quality=65)
![](/media/m2anxub0/1-riverbank-and-at-trail-seine-riverbank-stabilization.jpg?mode=crop&width=358&height=210&quality=65)
Seine Riverbank Stabilization at the Branch 1 Aqueduct
Client: City of Winnipeg
Location: Winnipeg, Manitoba
![](/media/c0fneine/img_5317-1-2.jpg?mode=crop&width=358&height=210&quality=65)
![](/media/dw3ntxfi/1_lake-expansion-showing-rerouted-at-path.jpg?mode=crop&width=358&height=210&quality=65)
Birds Hill Lake Improvements
Client: Manitoba Conservation and Water Stewardship
Location: Birds Hill Provincial Park, Manitoba
![](/media/bmdh1vlj/1.jpg?mode=crop&width=358&height=210&quality=65)
Seven Oaks School Division Learning and Service Centre
Client: Seven Oaks School Division & Prairie Architects
Location: West St. Paul, Manitoba